- Wind Turbine Project
- DVD Production System Project
- Re-Reeling & Slitting Machine Project
- SIMENS [BENDER FOR CONTINUOUS CASTER]
- SONY 82” TFT LCD TV Project
- Detector and Dry Tube Project
- 360 degree Work Platform Project
- CPC ALKYLATION PROJECT
- Disaster Relief for 2008 Sichuan earthquake
- SIEMENS
[Continuous Casting Machine] - SONY's Charters Project
- AIRBUS [ A321 16A Barrel ]
- BOG RECONDENSER
- Musical Instruments [NATIONAL TAIWAN SYMPHONY ORCHESTRA]
- Segment support frame
Object:
Continuous Casting Machine
Transport Method:
Sea / Break Bulk Vessel
Gross Weight:
1436,702 Kgs
Volume:
2404.608 CBM
Commentary:
A: Delivery all the oversize and overweight cargo to terminal.
B: Make sure all the cargo stored on open yard with tarpaulin covered.
C: UT group colleague supervise in terminal for all the loading procedure, in order to make sure no damage during the stuffing and loading.
D: Take photos for the cargo situation, and loading procedure.
E: Issue survey report to agent after the shipment on board.
F: Base on good relationship with terminal department which make all loading operation smoothly.