
- Wind Turbine Project
- DVD Production System Project
- Re-Reeling & Slitting Machine Project
- SIMENS [BENDER FOR CONTINUOUS CASTER]
- SONY 82” TFT LCD TV Project
- Detector and Dry Tube Project
- 360 degree Work Platform Project
- CPC ALKYLATION PROJECT
- Disaster Relief for 2008 Sichuan earthquake
- SIEMENS
[Continuous Casting Machine] - SONY's Charters Project
- AIRBUS [ A321 16A Barrel ]
- BOG RECONDENSER
- Musical Instruments [NATIONAL TAIWAN SYMPHONY ORCHESTRA]
- Segment support frame
Object:
LPRM Detector and Dry Tube
Dimensions:
1,488 CM x 56 CM x 41 CM
Gross weight:
15,000 Kilograms.
Transport Method:
Air
Route:
ORD to TPE
Shipping demands:
A. Due to the extreme long-sized shipment, to load into the plan by opening airplane nose is required.
B. Coordinated China Airlines Cargo to reserve the cargo flight for us.
C. In order to make the clearance quicker for this huge shipment, clean the shipment next to the flight is necessary. We applied all the paperwork for this process with Civil Aeronautics Administration, Aviation Police Office, and Taipei Custom Office in quite short time in advance.
D. Arranged the special folk lift to unload from the plane and loaded on the truck.