® SIMENS [CASTER]
® SONY 82" LCD TV
® Detector Tube
® Work Platform
® DRUM
® Earthquake Relief
® SIEMENS [Casting Machine]
® Charter Flights
® AIRBUS [ A321 ]
® BOG RECONDENSER
® Musical Instruments
® Segment support frame
SUPPLY CHAIN SOLUTIONS
LOGISTICS SERVICE
WAREHOUSING & DISTRIBUTION
TRACKING
CONTACT US
FEEDBACK
SITEMAP
PRACTICAL REFERENCE

- Wind Turbine Project
- DVD Production System Project
- Re-Reeling & Slitting Machine Project
- SIMENS [BENDER FOR CONTINUOUS CASTER]
- SONY 82” TFT LCD TV Project
- Detector and Dry Tube Project
- 360 degree Work Platform Project
- CPC ALKYLATION PROJECT
- Disaster Relief for 2008 Sichuan earthquake
- SIEMENS
[Continuous Casting Machine] - SONY's Charters Project
- AIRBUS [ A321 16A Barrel ]
- BOG RECONDENSER
- Musical Instruments [NATIONAL TAIWAN SYMPHONY ORCHESTRA]
- Segment support frame
a/c :
machinery
ship :
RO/RO
chassis :
MAFI
loading :
Hamburg
discharge :
pier – E.4 Keelung
procedure :
ensure eta n which pier# that sailing will be discharged. After vsl arrived. Hatch will be open n cargo will be delivered to location by MAFI.
Owing to high value + cargo weight exceed 58 tons. Owner action to shoring the cargo together with MAFI when loaded. Considering safety of ship n crews, m’while prevent any damage or slant when on the way. Must strong the shoring. So having a hole from W/case n re-action to lashing with deck.